INSTALLATION RECOMMENDATIONS
Windows must have the appropriate 'N rating' label (strength/water resistance) for the installation location.
Utmost care must be taken when lifting from trucks. Slings must not be used.
During any transportation or handling, windows and doors must be in the vertical position (with sill at the bottom). Sashes must be closed and in locked position.
Knocks and abrasions will damage the aluminium and glass. As these damages are not covered under warranty, it is recommended to avoid these at all costs.
When storing windows and doors (long or short term), products must be stacked carefully on their edges to avoid damage to finish. Storing in a dry location with a cover is highly recommended to prevent any dust or weather damage to paint or glass.
BEFORE INSTALLATION
Diagonal dimensions on frame and opening should be checked to ensure an easy fit.
Sufficient clearance around perimeter of the frame must be checked before attempting to install the window.
Aluminium frame should be insulated from contact with other metals to ensure no potential corrosion of the aluminium in the future. (Our flashing membranes will help protect to a certain extent).
Distortion of frames must be prevented by not forcing into an opening.
Sashes must be kept closed during frame installation.
Adequate clearance above head of window must be ensured as aluminium windows and doors are non-load bearing. (Allow 12mm clearance from underside of sill to top of sill brick or tile to allow for building settlement. If green timber or large floor members are used this needs to be increased. Alternatively, sill bricks or tiles can be installed after initial timber shrinkage has taken place).
Sill must be straight and level.
Plumb jambs in both directions then pack frame at sill and jambs only.
Frame must be square and out of twist to ensure smooth operation of sashes.
Check that diagonal measurements are equal.
Clearance must be maintained between sill brick or tiles and the window frame as detailed.
Fixings must be appropriate size, length and spacing for the windloading for the installation site.
Flashings must be correctly fitted.
Contact between aluminium framing and surrounding materials (bricks, concrete, concrete blockwork or cement rendered surfaces) must be prevented as severe corrosion can result.
Standing or placing any loads on framing is not permitted under any circumstance. Must not be used as support for scaffolding. Do not slide material through frames.
Tracks must be cleaned with a soft bristled brush to remove any material or debris/dirt prior to operation of panels.
Do not remove plastic wrap and black tape until brickwork is complete to prevent scratches to the glass and aluminium.
Where adhesive wrap is provided, ensure its complete removal within 120 days to avoid glue residue adhering to the glass or frame.
Wet cement, mortar, paint, acids and other chemicals must be washed off IMMEDIATELY as they occur.
Soft clothes should be used to clean glass and frames to avoid scratches on the surface.
A thorough clean up after installation and construction must be undertake. Warm soapy water or a mild detergent can be used followed by a rinse with clean water.